Bosch - Long Thanh, Dong Nai
celebrated the inauguration of the new plant (Lth101 with 17,000 sqm), which did not only allow to increase the production depth... the second component (loop-set) for its push belt. Since November 2012, HcP doubled the production floor space...
May 15
Bosch - Long Thanh, Dong Nai
celebrated the inauguration of the new plant (Lth101 with 17,000 sqm), which did not only allow to increase the production depth... the second component (loop-set) for its push belt. Since November 2012, HcP doubled the production floor space...
May 15
HcP] Lean Manufacturing & Document Control Intern
Bosch - Long Thanh, Dong Nai
celebrated the inauguration of the new plant (Lth101 with 17,000 sqm), which did not only allow to increase the production depth... the second component (loop-set) for its push belt. Since November 2012, HcP doubled the production floor space...
May 24
HcP] Lean Manufacturing & Document Control Intern
Bosch - Long Thanh, Dong Nai
celebrated the inauguration of the new plant (Lth101 with 17,000 sqm), which did not only allow to increase the production depth... the second component (loop-set) for its push belt. Since November 2012, HcP doubled the production floor space...
May 24
Manufacturing Technical Training Intern
Bosch - Long Thanh, Dong Nai
celebrated the inauguration of the new plant (Lth101 with 17,000 sqm), which did not only allow to increase the production depth... the second component (loop-set) for its push belt. Since November 2012, HcP doubled the production floor space...
May 15