Leads/Finishing -1st Shift - Cuba, MO ($17.25- $18.75)
Hubbell - Cuba, MO
* Benefits *Competitive wages w/ a 10% shift differential for 2nd shift. Overtime Required A Day In The Life Leads... to crimp connectors used to splice copper wire to lead wire or terminals. Finishing requires using taping machine and the...
May 7
Leads/Finishing 2nd Shift- $18.98 including shift differential
Hubbell - Cuba, MO
ability to apply finishing insulation material by hand. Overtime Required A Day In The Life Leads Ability to operate hydraulic crimpers... to crimp connectors used to splice copper wire to lead wire or terminals. Finishing requires using taping machine and the...
May 10
Leads/Finishing 2nd Shift- $18.98 including shift differential
Hubbell - Cuba, MO
ability to apply finishing insulation material by hand. Overtime Required A Day In The Life Leads Ability to operate hydraulic crimpers... to crimp connectors used to splice copper wire to lead wire or terminals. Finishing requires using taping machine and the...
May 9
Capping 1st Shift ($16.50-$17.00)
Hubbell - Cuba, MO
. Climate controlled facility. * Up to 4 weeks paid time off. * 11 Paid Holidays * Benefits *Competitive wages w/ a 10% shift... differential for 2nd shift. Overtime Required A Day In The Life Ensure that work practices are in the guidelines of OSHA...
May 9
SPX Corporation - Cuba, MO
contributor or you lead a large team, each of us leads. What benefits do we offer? We know that the well-being...
April 21