Senior Planning Engineer
Costain
- Lazenby, North Yorkshire
- Permanent
- Part-time
- Natural Gas Supply Pipeline Project. The Natural Gas used as the fuel for both the gas turbine and auxiliary boiler, is to re-use the out-of-service buried pipeline with a new buried 24” gas spur line to a new Above Ground Installation (AGI) within the PCC plot.
- CO2 Gathering network project. An approx. 14 km onshore medium pressure gathering network will be developed to enable industries from the North bank of the Teesside region to feed in their captured CO2 emissions for transportation to the HP compression station and storage offshore. The pipeline will be run overground using existing pipeline corridors around the Teesside region.
- HNC or Degree qualified in Civil Engineering.
- Experience of planning major civil engineering pipeline schemes.
- Excellent P6 skills including resourcing and cost loading.
- Oil & Gas experience in particular gas pipelines.
- Working closely with engineers/designers to ensure timely delivery of information.
- Champions Sustainability Safety, Health and Environment by putting personal safety and wellbeing at the heart of everything we do and helping the environment and communities to thrive
- Having integrity by always doing the right thing in the right way
- Must be customer focussed by striving for excellence through understanding, anticipating and meeting their needs
https://www.gov.uk/government/collections/disability-confident-campaign#LI-FS1